Musa Namık
ARSLANTAY was born in 1987 in Yumurtalik / ADANA. Musa Namık, the eldest child
in the family, started his primary education in Sugozu Village of Yumurtalik
district of Adana and completed his education at Ceyhan Gazi Primary School. He
started his high school life at Ceyhan Industrial Vocational High School and
continued his education in Ceyhan Technical High School by the School Principal
due to his success in his lessons, but he did not read 4th grade and
successfully received the Ceyhan Industrial Vocational High School diploma. Musa
Namık gained the Department of Electrical Education at Marmara University
Technical Education Faculty in 2005, and actively took part in many Social and
Technological activities within the University and graduated in 2009. In 2010, he completed his military
service
Musa Namık,
who started his first work experience at Kesir Engineering in 2010, worked in
Panel Manufacturing, Testing and Commissioning Departments. Within the body of
Kesir Engineering, Samsun OMW CCPP has made Generator Transformer (Generator
Step-up Transformer) and Internal need transformers (Auxilary Transformer)
Tests on behalf of METKA, Testing and commissioning of Medium Voltage Panels
and Low Voltage Panels, Equipment of Steam and Gas Turbines He performed
Calibration, Verification and Panel Revision in cold loop and hot loop tests of
instruments. The pride
of being part of a team and experienced the happiness, Turkey's first GE MARK
Vıe control system and Turkey's first
single shaft has successfully completed the project. Despite leaving Kesir
Engineering in 2013, he never broke his ties.
In 2013, he
worked with ENKA Inşaat as Electricity and Instrumentation Supervisor in Crude
Oil Early Production Facilities Project in SHELL Majnoon / BASRA / IRAQ. After the
successful completion of that project
end of 2013, he started as a Quality Supervisor in Erbil CCPP Project EPCM
ENKA Construction Co. Owner is Mass Global Holding in 2014, and the work has
been completed due to the end of the project. He added '' SAMSUNG '', one of
the world's giant South Korean companies, to his career life. In 2016, he
started working at Kırıkkale Independent Power Plant Project as a Quality Supervisor
at SAMSUNG C&T company and wrote his name on the career pages of Musa Namık
SAMSUNG due to the end of the contract and the end of work.
He worked as
Experienced Electricity and I&C Supervisor in the project of BECHTEL-ENKA
JV and SCPx - British Petroleum Company (BP).
Silk Road of
Energy, The price of Turkey, TANAP (Transmision Natural Gas Pipeline Project),
addressed as the key to Europe He worked Third party Electrical and
instrumentation inspector in IPMT
(Integrated Project Management Team)
started at LOT#4 ( Eskisehir to Greece border, then according project
needs to worked at Metering Station 3, 4 and last work adressed Compressor Station
– 1 at Damal / ARDAHAN. He inspected
profesionally to the Station Contractor TEKFEN
according to international standarts and
project specification. Compressor Station - 1
turnover to commissioning , handovered commissioning to operation team, After
the temporary acceptance and final acceptance, after that delivery to the
Operation teams, the work has been completed. During this period, the assembly
and inspection work of the equipment, devices and instruments that are
installed in the hazardous area assembly in compliance with the International
Standards includes the CompEX certificate with core competence from JTL. After
nearly 10 years of experience, ARSLANTAY Energy 's establishing Turkey and to
be the solution partner of both companies in the international platform, ARSLANTAY
Energy is pleased and proud to work like a department of the companies in
Project Design, Purchasing Processes, Installation, Quality, Testing and
Commissioning, Service & Maintenance processes.