About Us

ARSLANTAY

About Us

Musa Namık ARSLANTAY was born in 1987 in Yumurtalik / ADANA. Musa Namık, the eldest child in the family, started his primary education in Sugozu Village of Yumurtalik district of Adana and completed his education at Ceyhan Gazi Primary School. He started his high school life at Ceyhan Industrial Vocational High School and continued his education in Ceyhan Technical High School by the School Principal due to his success in his lessons, but he did not read 4th grade and successfully received the Ceyhan Industrial Vocational High School diploma. Musa Namık gained the Department of Electrical Education at Marmara University Technical Education Faculty in 2005, and actively took part in many Social and Technological activities within the University and graduated in 2009. In 2010, he completed his military service

Musa Namık, who started his first work experience at Kesir Engineering in 2010, worked in Panel Manufacturing, Testing and Commissioning Departments. Within the body of Kesir Engineering, Samsun OMW CCPP has made Generator Transformer (Generator Step-up Transformer) and Internal need transformers (Auxilary Transformer) Tests on behalf of METKA, Testing and commissioning of Medium Voltage Panels and Low Voltage Panels, Equipment of Steam and Gas Turbines He performed Calibration, Verification and Panel Revision in cold loop and hot loop tests of instruments. The pride of being part of a team and experienced the happiness, Turkey's first GE MARK Vıe  control system and Turkey's first single shaft has successfully completed the project. Despite leaving Kesir Engineering in 2013, he never broke his ties.

In 2013, he worked with ENKA Inşaat as Electricity and Instrumentation Supervisor in Crude Oil Early Production Facilities Project in SHELL Majnoon / BASRA / IRAQ. After the successful completion of that project  end of 2013, he started as a Quality Supervisor in Erbil CCPP Project EPCM ENKA Construction Co. Owner is Mass Global Holding in 2014, and the work has been completed due to the end of the project. He added '' SAMSUNG '', one of the world's giant South Korean companies, to his career life. In 2016, he started working at Kırıkkale Independent Power Plant Project as a Quality Supervisor at SAMSUNG C&T company and wrote his name on the career pages of Musa Namık SAMSUNG due to the end of the contract and the end of work.

He worked as Experienced Electricity and I&C Supervisor in the project of BECHTEL-ENKA JV and SCPx - British Petroleum Company (BP).

Silk Road of Energy, The price of Turkey, TANAP (Transmision Natural Gas Pipeline Project), addressed as the key to Europe He worked Third party Electrical and instrumentation inspector  in IPMT (Integrated Project Management Team)  started at LOT#4 ( Eskisehir to Greece border, then according project needs to worked at Metering Station 3, 4 and last work adressed Compressor Station – 1 at  Damal / ARDAHAN. He inspected profesionally to the Station Contractor  TEKFEN according to  international standarts and project specification. Compressor Station - 1  turnover to commissioning , handovered commissioning to operation team, After the temporary acceptance and final acceptance, after that delivery to the Operation teams, the work has been completed. During this period, the assembly and inspection work of the equipment, devices and instruments that are installed in the hazardous area assembly in compliance with the International Standards includes the CompEX certificate with core competence from JTL. After nearly 10 years of experience, ARSLANTAY Energy 's establishing Turkey and to be the solution partner of both companies in the international platform, ARSLANTAY Energy is pleased and proud to work like a department of the companies in Project Design, Purchasing Processes, Installation, Quality, Testing and Commissioning, Service & Maintenance processes.

Would you like us to give you detailed information about our services?